Pink Car Park

Pink Car Park


Ground remediation and substructure works for Europe’s first multi-storey coach park located at Wembley Park.

Project Overview:

  • Client: Huber Car Park Systems UK and Quintain Ltd

  • Type of Works: Piling, Groundworks, Substructure, External Works

  • Value: £14m

  • Project Start Date: October 2018

  • Location: Wembley, London

The complex consists of two parking levels for coaches, 290 parking bays, as well as a five-storey car park, 734 parking bays. At full capacity, it can accommodate up to 16,500 visitors. The suspended deck allows for the positioning of broadcasting vehicles for Wembley Stadium.

A scheme of this size requires substantial foundations that O’Keefe were able to assist with using our knowledge of the site conditions and ability to work in collaboration with the design team and client to produce the most effective solutions.

Previous
Previous

One Crown Place

Next
Next

Southbank Tower